Gabrielino Trail/Arroyo Seco Stabilization Project
Background
The Los Angeles Water Quality Control Board (“RWQCB”) requested Pasadena Water and Power (“PWP”) to implement sediment and erosion control measures in the Arroyo Seco, Area 1 to minimize sediment discharge from the emergency work completed by PWP in August 2023 to restore the Gabrielino Trail. The trail was washed-out during the February 2023 rainstorms.
PWP work plan was approved by the Los Angeles Water Quality Control Board (RWQCB RGP 63 File No. 24-002), California Department of Fish and Wildlife (EPIMS-LAN-62042-R5), and United States Army Corps of Engineers (USACE RGP 63 File No. SPL-2016-00270).
Project Information
PWP under the supervision of Dudek will raise the Gabrielino Trail, reinforce the embankment, improve riparian vegetation and wildlife habitat and restore the natural creek function. The map below shows the location of the work area.

Timeline
Construction will start on October 20 and be completed by November 26, 2025. Construction will take place Monday through Friday, from 7 a.m. to 7 p.m.
Impact
During construction the trail will be temporarily closed on weekdays and open during the weekends.
We apologize for any inconvenience. Thank you for your patience and cooperation.
Contact Information
Pasadena Water and Power:
- Roumiana Voutchkova at rvoutchkova@cityofpasadena.net or (626) 744-4486
- Norman Lara at nlara@cityofpasadena.net or (626) 786-4267
Dudek (Biological and Restoration Monitoring):
- Stuart Fraser (760) 479-4274