Parke Replacement Well Project

The Parke Groundwater Well is located in Villa Parke and replaces the Garfield Well, which was drilled in 1921 and formally decommissioned in 2020. Construction of the Parke Groundwater Well was divided into two phases: the below-grade improvements and the above-grade improvements.
Construction of the below-grade improvements commenced in October 2021 and were completed in April 2022. This work included drilling the well to a depth of approximately 820 feet, well construction and development, test pumping, and water quality sampling.
Construction of the above-grade improvements commenced in June 2023 and were completed in May 2025. This work included installation of a submersible pump and motor almost 500 feet below the ground surface, effectively reducing noise, piping, mechanical infrastructure, electrical equipment, and installation of a new basketball court. The well has the capacity to pump up to 1,500 gallons per minute—enough to fulfill the demand of nearly 2,800 households per year. Water from Parke Groundwater Well will travel to the proposed Sunset Complex for disinfection prior to being distributed into the water system.