Urban Water Management Plan
Pasadena’s Urban Water Management Plan (UWMP) is prepared every five years in compliance with the Urban Water Management Planning Act, California Water Code Sections 10610 through 10656.

2025 Urban Water Management Plan
The 2025 Urban Water Management Plan (UWMP) is an analysis of long-term water supply and demand planning for PWP, and includes a water system description, population and socioeconomic statistics, water supply reliability, drought risk assessment, demand management measures, and climate change impacts. The California Department of Water Resources requires urban water suppliers to prepare and adopt an UWMP every five years.
The Water Shortage Contingency Plan (WSCP) is a proposal for how PWP intends to operate during actual water shortage conditions and is a stand-alone document included in Appendix E of the UWMP.
Download the UWMP and WSCP below.